Sapura Menang
Date: 1.10.2015.

A purpose built semi-submersible self-erecting tender assisted drilling (TAD) rig was delivered on 27th March 1999 featuring dual BOP system (21 ¼” 2k & 13 5/8” 10k) and which is similar in design to the Sapura Pelaut. The unit was upgraded with a bootstrap triple mast and offline activity capability in 2004. The mooring system is upgraded to enable it to work on TLPs and SPARs in up to 6,000 feet of water depth with pre-laid mooring.